Guide
Ground investigation cost per metre, and in total, in 2026
Updated
A ground investigation (GI) is professional time, plant and laboratory testing, so the fee moves with scope. Here are typical 2026 domestic quotes, and the choices that move them.
Typical fees at a glance
| Scope | Typical fee |
|---|---|
| Phase 1 desk study only | £500–£1,200 |
| Phase 2, trial pits or window sampling, single plot | £1,500–£4,000 (lower half of the range) |
| Phase 2 with borehole rig, single plot | £1,500–£4,000 (upper half, and above for deep or difficult work) |
| Development sites, multiple plots | Scoped and priced per scheme |
These are typical market quote ranges, not fixed fees. You are buying the information your structural engineer needs to design foundations that suit the actual ground.
So the sensible order is: the engineer names the questions, the GI answers them, the foundation design follows. A GI scoped without knowing the questions tends to cost more and answer less.
Ground investigation cost per metre
Not published. None of the 94 ground investigation and site assessment firms read for this site's price index prints a rate per metre drilled or dug. The 3 that print any price give a fixed phase 1 desk study fee or a phase 2 starting price (read 12 Oct 2026).
Firms that drill price per metre inside a quote, beside rig mobilisation and laboratory testing. So compare total quotes for the same scope, not metre rates.
Source: Site Investigation Price Index: every row, with its source
What moves the fee
- Method: machine-dug trial pits are cheaper than boreholes; a tracked rig, deeper holes and in-situ testing push the fee up. See boreholes or trial pits.
- Access: a rear garden with no side access, live services or protected trees can add mobilisation and reinstatement cost.
- Laboratory testing: soil classification, chemical (contamination) suites and concrete design (sulfate) suites are itemised; more suites, higher fee.
- Reporting: the ground investigation report cost is normally inside the quoted fee. A factual report states what was found; an interpretative report adds engineering recommendations and costs more. See what's in the report.
Why the money is well spent
Foundation design is the single largest unknown in most self-build budgets. Suspect ground means shrinkable clay with trees nearby, made ground, slopes, or former industrial use.
There, building control bodies and structural warranty providers such as NHBC commonly require ground investigation evidence before approving foundations. That is standard practice on suspect ground, not a blanket legal rule.
Investigations are planned and reported to BS 5930 and Eurocode 7; a competent firm will reference both without being asked.
Contaminated land assessments follow the phased approach in the Environment Agency's land contamination guidance (gov.uk): desk study first, intrusive work only where the desk study justifies it. Doing phase 1 first is usually the cheapest way to spend less on phase 2.